Data Center Decommissioning
A formal, scoped exit from a cage, a suite or a full facility. Site survey, de-rack, cable pull, data sanitization, chain-of-custody signoff and reporting — delivered to a published schedule and a signed scope.
Scope of work, in order
Site survey
Before anything moves, a project lead visits the facility (or walks it remotely with your on-site hands, for colocation suites where physical access is restricted). We confirm rack counts, PDU configuration, overhead and underfloor cable paths, the available dock, freight-elevator weight ratings, the DC’s own escort and badging requirements, and the window in which work can run without touching live services in adjacent cages. Nothing about an enterprise exit is standard, and skipping the survey is the fastest way to miss a weekend and a rebate deadline.
Data sanitization: on-site or in-transit under seal
Two workflows are available. On-site sanitization — the preferred option under HIPAA and most DoD-adjacent engagements — executes the NIST 800-88 workflow at the facility, before drives leave the cage, with a witness from your side present. In-transit under seal ships drives in tamper-evident containers directly to the Lathrop processing floor and sanitizes on arrival; seal numbers are logged at origin, in transit (checkpoint scans), and at intake. Pick the workflow in the scope of work; we will not switch mid-engagement without written authorization.
De-rack and cable pull
Servers, switches and storage come out top-down. Fiber and copper are pulled, bundled, labeled and inventoried; structured cabling that is being left in place for the next tenant is marked and left alone. Rack-mount rails are collected with the host asset so they can be remarketed together — a set of matching Dell or HPE rails is not a line item most teams remember to list, and they do carry recovery value.
Chain-of-custody signoff
Dual signature at the dock: your site lead and our carrier, against a packing manifest keyed to serial numbers captured during de-rack. From that moment forward every event sits against one program number in our tracker, and the audit trail is continuous to final disposition.
Reporting and closeout
Closeout package delivered within ten business days of the last outbound truck: per-serial asset register with disposition, per-serial Certificate of Data Sanitization, weights by category, reuse/recycle/destroy split, downstream vendor roster, and the USD settlement. Your sustainability team gets a formatted Scope 3 Category 5 extract alongside, so the lot does not need to be reconciled twice.
The U.S. enterprise angle
Most of the data-center exits we run in the U.S. originate from one of four scenarios: a lease expiring at an Equinix, Digital Realty, CoreSite or CyrusOne suite with a hard move-out date; a hyperscale tenant consolidating from multiple regional cages into a single hall; a merger-and-acquisition cleanup where the acquirer is standardizing on a smaller footprint; or a regulated-industry tenant retiring older generations under a refresh mandate. Each has its own paperwork pattern and its own deadline pressure, and the program is scoped accordingly.
The Lathrop, California facility sits inside a day’s drive of the Bay Area, Reno-Sparks and Southern California DC corridors, which keeps transit times and sealed-container risk short for most West Coast exits. East Coast and Midwest engagements run through bonded regional carriers under the same chain-of-custody protocol.